PUBLIC NOTICE Request for Proposals (RFP) Gravel Parking Lot Installation with Permeable Paver System Fire Station Parking Area Project Name: Fire Station Gravel Parking Lot Construction Project Location: Station 111, 37546 Pine Street Ext. Pearl River, LA 70452 Issue Date: 11/2/2026 Proposal Due Date: 12/28/2026 Bids will be opened at the Board of Commissioners Meeting located at the same site on 1/12/2027 at 1900 hrs. ________________________________________ 1. Project Overview The Fire Department is soliciting proposals from qualified contractors for the construction of a permeable gravel parking lot utilizing the TrueGrid Pro Plus Permeable Paver System or equivalent brand. The project consists of site preparation, excavation as required, installation of drainage improvements, placement of suitable fill material, construction of the aggregate base, installation of the permeable paver system, and placement of all specified stone and gravel materials. The completed parking area shall measure approximately 115 feet by 120 feet (13,800 square feet) and be capable of supporting emergency response and fire department vehicle traffic. ________________________________________ 2. Scope of Work The successful contractor shall furnish all labor, equipment, supervision, transportation, materials, and incidentals necessary to complete the project. A. Site Preparation 1. Mobilization and site layout. 2. Erosion and sediment control measures as required. 3. Clearing and grubbing of vegetation and unsuitable materials within the project limits. 4. Establish final grades to provide positive drainage. B. Excavation and Subgrade Preparation 1. Evaluate existing subgrade conditions. 2. Remove and dispose of unsuitable soils, organics, saturated materials, and muck as necessary. 3. Excavate to the depths required for proper installation of the parking lot system. 4. Import and place approved structural fill material were required. 5. Compact fill and subgrade to achieve stable support for the aggregate base and paver system. C. Drainage Improvements 1. Furnish and install: o One (1) 18-inch diameter culvert. o Approximate length: 30 linear feet. 2. Culvert shall be HDPE, reinforced concrete, or equivalent approved material. 3. Provide all excavation, bedding, backfill, grading, and end treatments necessary for a complete installation. D. Aggregate Base Construction Contractor shall provide recommendations and construct a base system suitable for anticipated loading conditions and site soils. Minimum requirements include: 1. Geotextile stabilization fabric where necessary. 2. Placement and compaction of aggregate base material(s) suitable for the TrueGrid Pro Plus system or equivalent. 3. Base thickness shall be designed and installed according to: o Manufacturer recommendations. o Site soil conditions. o Expected fire apparatus and heavy vehicle loads. Contractor shall specify proposed: Aggregate types. Aggregate gradations. Layer thicknesses. Compaction methods. E. Permeable Paver Installation 1. Furnish and install all permeable pavers. 2. Install in accordance with manufacturer's current specifications and installation guidelines. 3. Install edge restraints as required to maintain system integrity. 4. Ensure proper alignment and grading throughout installation. F. Gravel Surface Material 1. Furnish and place all required infill stone and surface aggregate. 2. Fill and compact paver cells per manufacturer requirements. 3. Provide a finished driving surface suitable for: o Passenger vehicles. o Pickup trucks. o Fire department apparatus. o Delivery and service vehicles. G. Final Grading and Cleanup 1. Fine grading of disturbed areas. 2. Removal of excess materials and debris. 3. Restoration of adjacent disturbed surfaces. 4. Final site cleanup. ________________________________________ 3. Approximate Quantities Item Quantity Parking Area 13,800 SF Permeable Paver System 13,800 SF Culvert 18" x 30 LF Structural Fill As Required Aggregate Base As Required Surface Aggregate As Required These quantities are provided for estimating purposes only. The contractor is responsible for verifying actual quantities. ________________________________________ 4. Proposal Requirements Proposals shall include: A. Lump Sum Price Provide a turnkey price that includes: Mobilization Excavation Muck removal (if required) Imported fill material Culvert installation Geotextile fabric Aggregate base Permeable Paver System materials Surface stone Labor Equipment Cleanup B. Unit Prices Provide separate unit pricing for: Muck excavation and disposal (per cubic yard) Imported fill (per cubic yard) Additional aggregate material (per cubic yard) Additional excavation (per cubic yard) C. Schedule Provide: Estimated project duration Lead time for material procurement Proposed start date ________________________________________ ________________________________________ 5. Site Visit Contractors are encouraged to visit the site and become familiar with existing conditions prior to submitting a proposal. ________________________________________ 6. Owner's Rights The Fire Department reserves the right to: Reject any or all proposals. Accept the proposal deemed in the best interest of the department. Negotiate scope or pricing with selected contractors. Request additional information from any proposer. 206299NO11-18-26DEC2-4T $639.48